Regular Village Board meetings are typically held at 7:00 p.m., the first three Tuesdays of each month in Council Chambers of Village Hall (room 201), 123 Madison St. When a Regular Meeting falls on a holiday, the meeting typically is held the following night. The Village Board also meets in special sessions from time to time. However, dates and times of Special Meetings can vary and may change.

File #: RES 18-814    Name:
Type: Resolution Status: Passed
In control: President and Board of Trustees
On agenda: 2/20/2018 Final action: 2/20/2018
Title: A Resolution Authorizing the Submission of a Metropolitan Water Reclamation District of Greater Chicago Stormwater Management Phase II Flood Control Program Cost Sharing Application for the Berkshire Street Flood Mitigation Improvement Project
Attachments: 1. 2-20-18_Resolution-MWRDGrantBerkshire.pdf, 2. Berkshire Pages from Oak Park Sewer Master Plan Report.pdf

Submitted By                     

Bill McKenna, Village Engineer

 

Reviewed By

LKS

 

Agenda Item Title

Title

A Resolution Authorizing the Submission of a Metropolitan Water Reclamation District of Greater Chicago Stormwater Management Phase II Flood Control Program Cost Sharing Application for the Berkshire Street Flood Mitigation Improvement Project

 

End

Overview

Overview

This resolution authorizes staff to submit an application to the Metropolitan Water Reclamation District of Greater Chicago (MWRD) for their Stormwater Management Phase II Flood Control Program which is a cost sharing grant program for a proposed flood mitigation project on Berkshire Street from Grove to Linden Avenues.  The Berkshire sewer project is already included in the FY2018 budget and any grant funds received would offset local water and sewer funds.

 

Body

Staff Recommendation

Approve the Resolution

 

Fiscal Impact

The FY2018 budget includes $1M in the Water and Sewer Fund, Sewer Collection, Capital Improvements, for Flood Mitigation Improvements account no. 5040-43750-781-570707 for construction of the Berkshire sewer project. 

 

The MWRD cost sharing program does not have a predefined local match cost sharing percentage requirement or maximum or minimum levels of funding.  Final cost sharing amounts will be determined after MWRD selects receipts of their grants.  Based on staff’s understanding of typical projects which have received similar MWRD funding in the past, staff is estimating that should the Village receive the grant that MWRD may fund the project at a 70/30 cost sharing split for roughly $700,000 in MWRD funding and $300,000 in Village funds depending on final costs of the project once design is completed.

 

Background

The Village’s Combined Sewer System Master Plan Report identifies a number of larger relief sewer projects to improve the performance of the Village’s combined sewer system which will reduce the frequency and severity of sewer backups into basements.  Relief sewer projects were scored on a benefit to cost ratio in order to prioritize these large improvements.  The proposed sewer project on Berkshire will improve the capacity of the sewers along the adjacent blocks and was also recommended for implementation at this time because the pavements are in need of replacement.

 

Staff has completed preliminary plans for this project and the current estimated cost for the work is approximately $1 million.  Based on conversations with MWRD and their typical funding levels for this cost sharing program, staff is estimating that should the Village receive a grant it may be in the range of $700,000 in MWRD assistance to help fund this project and offset local cost. 

 

Grant applications are due on February 23, 2018 with an anticipated award notice in the late spring of 2018.

 

Alternatives

The Village could decline the opportunity to submit a grant application for this project.

 

Previous Board Action

N/A.

 

Citizen Advisory Commission Action

N/A.

 

Anticipated Future Actions/Commitments

Should the Village of Oak Park be awarded a MWRD grant, the Village will needs to enter into an agreement for this grant.

 

Intergovernmental Cooperation Opportunities

The MWRD Flood Control Program involves MWRD working with the Village of Oak Park to provide funding for flood relief projects.

 

Performance Management (MAP) Alignment

This work is in alignment with the Governance Priority for the Department of Public Works for Infrastructure/Capital Programs.