Skip to main content
logo

Regular Village Board meetings are typically held at 7:00 p.m., the first three Tuesdays of each month in Council Chambers of Village Hall (room 201), 123 Madison St. When a Regular Meeting falls on a holiday, the meeting typically is held the following night. The Village Board also meets in special sessions from time to time. However, dates and times of Special Meetings can vary and may change.

File #: RES 26-103    Name:
Type: Resolution Status: Consent Agenda
In control: President and Board of Trustees
On agenda: 1/13/2026 Final action:
Title: A Resolution Approving an Independent Contractor Agreement with Pipe View, LLC. d/b/a Pipe View America for Project 25-10 Sewer Cleaning and Inspection, in an Amount not to Exceed $105,730 and Authorizing its Execution
Attachments: 1. 1 - Resolution.pdf, 2. 2 - Agreement.pdf, 3. 3 - Proposal.pdf, 4. 4 - RFP.pdf, 5. 5 - Proposal Summary.pdf, 6. 6 - LocationMap.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 

Title

title

A Resolution Approving an Independent Contractor Agreement with Pipe View, LLC. d/b/a Pipe View America for Project 25-10 Sewer Cleaning and Inspection, in an Amount not to Exceed $105,730 and Authorizing its Execution                                                       

..end

 

Introduction

overview

Competitive proposals were received on January 2nd for the Sewer Cleaning and Inspection Project. Four contractors submitted proposals for the project. The lowest qualified proposal was submitted by Pipe View America in the amount of $105,730. The project consists of cleaning and television inspection of approximately 6.5 miles of sewers ranging in size from 9 to 84 inches in diameter.                                          

end
body

Recommended Action

Adopt the Resolution.

Prior Board Action

There is no prior Board action associated with this item.

Background

The project consists of cleaning and television inspection of approximately 6.5 miles of sewers ranging in size from 9 to 84 inches in diameter. Sewer cleaning and inspection is an annual project which is used to clear debris and blockages from sewers to maintain flow, determine sewer condition and future capital improvement needs, and to help manage the combined sewer system asset. The locations of the sewers scheduled for sewer cleaning and inspection are included as an attachment.

Timing Considerations

Adoption at this time will allow for the project to advance on a suitable timeline.

Budget Impact

There are available funds for this work in the FY2026 Budget in the Water and Sewer Fund, Public Works-Sewer, Sewer Collection, External Support, account #5040-43750-781-530667.

Operating Impact

There is no operating impact associated with this item. The item aligns with the department’s core service delivery.

DEI Impact

There is no DEI impact associated with this item.

Community Input

There has been no community input given in relation to this item.

Staff Recommendation

Adopt the Resolution.

Advantages:

                     This proposed agreement will allow for the procurement of needed services.

Disadvantages:

                     There are no disadvantages to this recommendation.

Alternatives

Alternative 1:

The Board can table the item for additional information or discussion.

Advantages:

                     Board Members would be presented with the additional information they requested.

Disadvantages:

                     The timing of the eventual Board action will impact the desired implementation schedule.

Alternative 2:

The Board can vote down the item.

Advantages:

                     This action can result in short-term cost savings.

Disadvantages:

                     Necessary sewer cleaning and inspections would not take place. 

Anticipated Future Actions

There are no anticipated future actions in relation to this item.

Prepared By: Bill McKenna, Village Engineer/Assistant Public Works Director

Reviewed By: Rob Sproule, Public Works Director

Approved By: Kevin J. Jackson, Village Manager

Attachment(s):

1.                     Resolution

2.                     Agreement

3.                     Proposal

4.                     RFP

5.                     Proposal Summary

6.                     Project Location Map