Title: A Resolution Approving a Contract with R.W. Dunteman Company for Project No. 26-6 Pavement Preservation, in an Amount not to Exceed $588,000 and Authorizing its Execution
Attachments: 1. 1 - Resolution.pdf, 2. 2 - Contract and Bond.pdf, 3. 3 - Proposal.pdf, 4. 4 - Project Location Map.pdf, 5. 5 - Bid Summary.pdf

 

Title

title

A Resolution Approving a Contract with R.W. Dunteman Company for Project No. 26-6 Pavement Preservation, in an Amount not to Exceed $588,000 and Authorizing its Execution                                                       

..end

 

Introduction

overview

Competitive bids were opened on July 9th for the 2026 pavement preservation project. The Village received two bids for the project with the lowest qualified bid from R.W. Dunteman Company in an amount of $588,000. The project involves pavement patching, crack filling, micro-surfacing, and pavement rejuvenators on local streets throughout the Village.                                          

end
body

Recommended Action

Adopt the Resolution.

Prior Board Action

There is no prior Board action associated with this item.

Background

The 2026 pavement preservation project includes crack filling, pavement patching, micro-surfacing, and pavement rejuvenators on various local streets throughout the Village. Microsurfacing is an ultra-thin overlay around ¼” thick on roadways used to help seal the pavement, smooth out any rutting, and provide a new driving surface, which helps extend the life of the underlying pavement by around 5-7 years. Asphalt rejuvenator is a liquid emulsion sprayed on roads that aims to restore and preserve the durability and flexibility of asphalt.   

This year’s project also includes patching on Austin Boulevard which was originally scheduled for resurfacing using federal funds but has been delayed until 2027 due to CDOT and IDOT reviews and coordination.  

The Village received two bids for the project with the low responsible bid from R.W. Dunteman Company in an amount of $588,000. R.W. Dunteman Company previously completed pavement preservation projects for the Village and has done a good job. 

Timing Considerations

Adoption of the Resolution at this time will allow for the contractor to complete construction in the desired timeframe. Construction of the Pavement preservation Project is scheduled to be completed by the end of October of this year.

Financial Impact

There is $500,000 available for this work in the FY 2026 Budget in the Capital Improvement Fund in the Capital Improvement Fund, Public Works - Engineering, for Pavement Preservation account no. 3095-43780-101-570977. There is $88,000 available for this work in the FY 2026 Budget in the Capital Improvement Fund in the Capital Improvement Fund, Public Works - Engineering, for Local Street Construction account no. 3095-43780-101-570951 for the patching work on Austin Boulevard.

Operations Impact

There is no operating impact associated with this item. The item aligns with the department’s core service delivery.

DEI Impact

There is no DEI impact associated with this item.

Community Input

There has been no community input given in relation to this item.

Staff Recommendation

Adopt the Resolution, which will allow for the construction of this project to move forward on its desired schedule.

Advantages:

                     This contract will allow for the procurement of needed services.

Disadvantages:

                     This contract requires the expenditure of funds.

Alternatives

Alternative 1:

The Board can delay action to gain additional information.

Advantages:

                     Board Members would be presented with the additional information they requested.

Disadvantages:

                     The timing of the eventual Board action will impact the desired implementation schedule.

Alternative 2:

The Board can vote down the item.

Advantages:

                     This action can result in potential cost savings.

Disadvantages:

                     Needed pavement rehabilitation will not occur, resulting in accelerated deterioration of the roadway and increased long-term costs for managing the overall roadway system’s pavements.

Anticipated Future Actions

There are no anticipated future actions in relation to this item.

Prepared By: Bill McKenna, Village Engineer/Assistant Public Works Director

Reviewed By: Rob Sproule, Public Works Director

Approved By: Kevin J. Jackson, Village Manager

Attachment(s):

1.                     Resolution

2.                     Contract and Bond

3.                     Proposal

4.                     Project Location Map

5.                     Bid Summary