Legislation Details

File #: RES 15-476    Name:
Type: Resolution Status: Passed
In control: President and Board of Trustees
On agenda: 11/2/2015 Final action: 11/2/2015
Title: A Resolution Approving the Execution of a Contract with J. Nardulli Concrete, Inc., for Project 15-3, 2015 Sidewalk and Curb and Gutter Replacement, in an Amount Not to Exceed $150,000 and Authorizing its Execution
Attachments: 1. 11-02-15_Resolution-15-3SidewalkImprovements.pdf, 2. 11-02-15_AttachmentA_Contract_15-3 SidewalkImprovements.pdf, 3. 11-02-15_AttachmentB_15-3BidSummay.pdf, 4. 11-02-15_AttachmentC_NardulliProposal15-3.pdf

Submitted By                     

Bill McKenna, Village Engineer

 

Reviewed By

LKS

 

Agenda Item Title

Title

A Resolution Approving the Execution of a Contract with J. Nardulli Concrete, Inc., for Project 15-3, 2015 Sidewalk and Curb and Gutter Replacement, in an Amount Not to Exceed $150,000 and Authorizing its Execution

 

End

Overview

Overview

Competitive bids were opened on October 22, 2015 for the Sidewalk and Curb and Gutter Replacement project.  Nine contractors picked up proposal documents and five bids were received.  The low compliant bid was submitted by J. Nardulli Concrete, Inc. in an amount of $129,050.  It is recommended to award the contract at the full budgeted amount of $150,000 so additional sidewalk locations can be replaced.

 

Body

Staff Recommendation

Approval.

 

Fiscal Impact

A total of $150,000 has been budgeted in the 2015 Capital Improvement Plan for sidewalk improvements.  Funds for this project come from CDBG account 2083-46201-822-583652.

 

Background

This project includes the replacement of approximately 14,000 square feet of sidewalks, as well as additional quantities for curbs, driveway apron replacement, and other items associated with this concrete work.  Sidewalk replacement will take place at numerous locations throughout the Village. 

 

Sidewalk locations have been prioritized based on a sidewalk survey conducted by the Engineering Division staff in 2014 & 2015.  Staff surveys approximately ¼ of the Village each year.  A typical sidewalk square (25 sq. ft.) costs about $205 to replace.  The Village covers 100% of the cost for replacement for the majority of sidewalks identified in our surveys.  Homeowners can share 50% of the cost, or roughly $102.50 per sidewalk square, to replace sidewalks not identified in the surveys.

 

Staff is recommending that the total budgeted amount of $150,000 be awarded for the contract so that additional sidewalk locations in need of replacement can be included in the project.

 

Alternatives

The alternative to this recommendation could be to delay action to gain additional information.

 

Previous Board Action

N/A.

 

Citizen Advisory Commission Action

N/A.

 

Anticipated Future Actions/Commitments

None at this time.

 

Intergovernmental Cooperation Opportunities

The Engineering Division works with the Park District of Oak Park and the School Districts to identify sidewalk squares in need of replacement within the public right-of-way along their frontages so that they can be replaced with the Village’s sidewalk program which typical provides the lowest possible cost for sidewalk replacement.

 

Performance Management (MAP) Alignment

This work is in alignment with the Governance Priority for the Department of Public Works for Infrastructure/Capital Programs.