Skip to main content
logo

Regular Village Board meetings are typically held at 7:00 p.m., the first three Tuesdays of each month in Council Chambers of Village Hall (room 201), 123 Madison St. When a Regular Meeting falls on a holiday, the meeting typically is held the following night. The Village Board also meets in special sessions from time to time. However, dates and times of Special Meetings can vary and may change.

File #: RES 25-260    Name:
Type: Resolution Status: Consent Agenda
In control: President and Board of Trustees
On agenda: 9/9/2025 Final action:
Title: Concur with the Housing Programs Advisory Committee and Adopt the Resolution Authorizing a Single-Family Housing Rehabilitation Loan (SFR-103B)
Attachments: 1. RESOLUTION-Authorizing a Rehabilitation Loan SFR-103B, 2. Exhibit I Mortgage SFR-103B, 3. Exhibit II Note SFR-103B, 4. Exhibit III Agreement SFR-103B
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 

Title

title

Concur with the Housing Programs Advisory Committee and Adopt the Resolution Authorizing a Single-Family Housing Rehabilitation Loan (SFR-103B)                                                        

..end

 

Introduction

overview

The purpose of the Single-Family Housing Rehabilitation (SFR) Loan Program is to address and correct deteriorated and blighted homes throughout the Village. The eligible homeowner requests a deferred loan of $25,000 from the Village.                                          

end
body

Recommended Action

Staff recommends the Board approve the resolution.

Prior Board Action

The Board has taken the following prior action:

                     RES 24-297: A Resolution Authorizing a Lead Hazard Reduction Grant (SFR-103)

Background

On July 15, 2025, the Board approved guidelines for the Residential Rehabilitation Program. Prior to that time, the Village operated the Single-Family Housing Rehabilitation (SFR) Program. That that meeting, staff indicated that there were a small number of SFR applications which were still making their way through the approvals process. This is one such application.

Using Community Development Block Grant (CDBG) funding from the U.S. Department of Housing and Urban Development (HUD), the Single-Family Housing Rehabilitation (SFR) Program provides loans to low and very low-income owners/occupants of single-family properties to correct documented or potential code violations, address deficiencies, and make general property improvements. There are two loan products to support program goals: 1) A deferred-payment loan program that provides no-interest loans of up to $25,000, deferred for repayment for 20 years; and 2) an emergency loan program that provides no-interest loans of up to $5,000 per unit, deferred for repayment for 5 years, for correction of single emergencies, code violations of an emergency nature, or life-endangering circumstances. A minimum contingency of 10% is added to the loan principal to cover any unforeseen conditions and is removed from the loan if not used.

The primary eligibility criteria for all loans are as follows: 1) The household income must be within HUD income limits; 2) There must be adequate equity; 3) Rehabilitation work must be primarily code-related, basic repair work. For each eligible applicant, the Neighborhood Services Department determines financial eligibility, inspects the property, and prepares a detailed scope of work with a line-by-line item cost estimate. Using the scope of work, the homeowner invites contractors pre-qualified by the Village to bid on the project. The homeowner is responsible for selecting the contractor, however, the accepted bid cannot be more than 10% above the cost estimate or more than 15% below the cost estimate.

As of January 10, 2002, lead hazard reduction activities are required on any federally-funded housing rehabilitation project. Three levels of lead hazard procedures exist. For projects under $5,000, the contractor must not create any hazards, including the creation of lead dust. For projects between $5,001 and $25,000, all deteriorated surfaces, containing lead in the affected areas, must be stabilized with no new hazards created. For projects over $25,001, lead hazards in the affected areas must be removed.

Since the Village's maximum loan amount is $25,000, only interim controls are required to alleviate deteriorated lead-based paint surfaces. The Village contracts with an independent lead inspector to perform a lead risk assessment for each property and identify all lead-based paint surfaces. The contracted lead inspector also provides the Village with a list of deteriorated surfaces that must be controlled. Using the Lead Inspection Report, staff develops specifications for the lead hazard reduction work that are incorporated into the scope of work. The successful contractor must either provide documentation that they have certified lead workers on staff or that they have a lead-certified subcontractor that can handle the specified work. Any subcontractors must meet all Village eligibility requirements. CDBG funds for lead work are given to the property owner as a grant following the model of the Cook County HOME Program.

SFR-103B is:

1) A $25,000 rehab loan to the low-income owner/occupant household of this property. The owner’s income qualifies for a deferred-payment loan. The $25,000 includes a $25,000 rehabilitation cost, as seen on the bid spreadsheet. The mortgage amount is $25,000. If the entire contingency is not used, an Amended Mortgage will be recorded on the title for the exact amount of the loan.

The funding for this request is the CDBG revolving loan fund, totaling $25,000. The CDBG Revolving Loan fund is comprised of re-paid CDBG single-family loans that are paid back when the loan recipient sells their home or transfers the title to another entity. The $25,000 mortgage is deferred for repayment until a transfer of title or a date 20 years from the date of loan approval (September 9, 2025). The mortgage and note are written in the amount of $25,000, the $25,000 principal. 

The scope of work is detailed on the Loan Summary Form with additional detailed information about this project. The owner meets all program eligibility requirements, including the three major criteria for income, equity, and eligible scope of work.

The project was put out for bid. Three contractors attended the scheduled walkthrough. Three contractors submitted bids. Two bids were within the cost threshold allowed by HUD. The homeowner agreed to pay any and all expenses exceeding the loan amount of $25,000. The homeowner selected A.T. Jones as their contractor.

The post-rehab equity meets the program guideline requiring post-rehab equity of at least 10%. For purposes of determining equity, staff obtained the estimated market value of the property as posted on the Cook County Tax Assessor’s website. With a total debt of $222,486.10 that includes a $192,486.10 first mortgage, a $5,.000.00 home equity loan and $25,000.00 Village Mortgage for this project, there will be 28.23% in post-rehab equity. The Village’s investment is protected.

Timing Considerations

There are no specific timing considerations associated with this item.

Budget Impact

Funding from the Village loan is from Fund 2020, the Community Development Revolving Loan Fund. After funding this loan, the revolving loan fund will have a remaining balance of $112,814 (Account #2020.46206.101.585613).

Staffing Impact

There will be a need to regularly perform progress inspections to monitor the project; however, this item aligns with the department’s core service delivery. No new staff will be required.

DEI Impact

These programs are designed to assist low- to moderate-income individuals who are within HUD income limits.

Community Input

All loan and grant requests are reviewed by the Housing Program Advisory Committee (HPAC) before they are presented for Board approval. On August 20, 2025, HPAC voted to recommend that the Village Board approve the rehabilitation loan.

Staff Recommendation

Staff is recommending the Board approve the resolution allowing the homeowner to secure a home rehabilitation loan to fix hazards and correct code violations.

Advantages:

                     Approving the resolution furthers the Village Board goal of Community Affordability

                     Approving the resolution furthers the Village Board goal of Vibrant, Diverse, Connected Neighborhoods.

Disadvantages:

                     There are no disadvantages to approving the recommendation.

Alternatives

Alternative 1:

The Board can elect not to approve the resolution.

Advantages:

                     There are no advantages to not approving the resolution.

Disadvantages:

                     The homeowner will not be able to make the necessary repairs to their residence.

Anticipated Future Actions

There are no anticipated future actions in relation to this item.

Prepared By: Jeffrey J. Prior, Neighborhood Services Programs Manager

Reviewed By: Jonathan Burch, Assistant Village Manager/Neighborhood Services Director

Approved By: Kevin J. Jackson, Village Manager

Attachment(s):

1.                     Resolution Authorizing a Rehabilitation Loan SFR-103B

2.                     Exhibit I Mortgage SFR-103B

3.                     Exhibit II Note SFR-103B

4.                     Exhibit III Agreement SFR-103B