Regular Village Board meetings are typically held at 7:00 p.m., the first three Tuesdays of each month in Council Chambers of Village Hall (room 201), 123 Madison St. When a Regular Meeting falls on a holiday, the meeting typically is held the following night. The Village Board also meets in special sessions from time to time. However, dates and times of Special Meetings can vary and may change.

File #: RES 17-659    Name:
Type: Resolution Status: Passed
In control: President and Board of Trustees
On agenda: 10/16/2017 Final action: 10/16/2017
Title: A Resolution Approving an Independent Contractor Agreement with Path Construction Company, Inc. for Lombard Avenue Bridge Expansion Joint Repairs in an Amount not to Exceed $28,850.00 and Authorizing its Execution.
Attachments: 1. Resolution-Lombard Ave Bridge Repairs, 2. Independent Contractor Agreement-Lombard Ave Bridge Repairs, 3. Attachment-Bid Summary-Lombard Ave Bridge Repairs, 4. Attachment-Path Construction Bid-Lombard Ave Bridge Repairs, 5. Attachment-Lombard Ave Bridge Plans 1990, 6. Attachment-Path Construction Sec. of State
Submitted By
John P. Wielebnicki, Director of Public Works

Reviewed By
CLP

Agenda Item Title
Title
A Resolution Approving an Independent Contractor Agreement with Path Construction Company, Inc. for Lombard Avenue Bridge Expansion Joint Repairs in an Amount not to Exceed $28,850.00 and Authorizing its Execution.

End
Overview
Overview
The Lombard Avenue Bridge requires expansion joint replacement on the north side of the bridge that crosses I-290. The expansion joint is located where the bridge deck meets the roadway. This expansion joint has failed and is need of replacement.

Body
Staff Recommendation
Approve the Resolution.

Fiscal Impact
The FY 2017 Capital Improvement Fund provides funds in the amount of $30,000.00 to perform Home Avenue Bridge Repairs, in the Local Street Construction account, no. 3095-43780-101-570951. The Home Avenue bridge work is proposed to be deferred until 2018 to allow this priority work on the Lombard Avenue bridge to be completed.

The cost for the expansion joint replacement performed by Path Construction Company, Inc. shall not exceed $28,850.00.

Background
In late 2016 Public Works staff became aware that the expansion joint on the Lombard Avenue bridge crossing I-290 had failed and was in need of repair. The expansion joint consists of rubber strips connected to metal plates bolted into the concrete surface of the bridge on one side and the roadway on the other. This allows a flexible area to conform to change in temperature that cause the surfaces to expand or contract. A temporary repair was made at that time to make the roadway safe but a more permanent repair is needed.

Competitive bids were opened on September 8th, 2017 in response to a call for bids for the Lombard Avenue Bridge Expansion Joint Project on August 23rd, 2017. The bid was advertised in the local paper, the Village web site, and three bid packages were sent out to contractors. Four bids were received.

The low responsible bid was submit...