Regular Village Board meetings are typically held at 7:00 p.m., the first three Tuesdays of each month in Council Chambers of Village Hall (room 201), 123 Madison St. When a Regular Meeting falls on a holiday, the meeting typically is held the following night. The Village Board also meets in special sessions from time to time. However, dates and times of Special Meetings can vary and may change.

File #: RES 23-54    Name:
Type: Resolution Status: Passed
In control: President and Board of Trustees
On agenda: 2/6/2023 Final action: 2/6/2023
Title: A Resolution Approving an Independent Contractor Agreement with D Kersey Construction Co. for the Public Works Center Wash Bay Drainage Improvements Project in an Amount Not to Exceed $141,120.00 and Authorizing its Execution
Attachments: 1. Resolution - 2023 PWC Wash Bay Improvements, 2. Independent Contractor Agreement - 2023 PWC Wash Bay Improvements, 3. Attachments - 2023 PWC Wash Bay Improvements

Submitted By                     

Rob Sproule, Public Works Director

 

Reviewed By

A.M. Zayyad

 

Agenda Item Title

Title

A Resolution Approving an Independent Contractor Agreement with D Kersey Construction Co. for the Public Works Center Wash Bay Drainage Improvements Project in an Amount Not to Exceed $141,120.00 and Authorizing its Execution

 

End

Overview

Overview

The existing wash bay plumbing system at the Public Works Center requires replacement in order to mitigate frequent flooding and floor drain blockage. The wash bay is used daily to clean Public Works vehicles and equipment. The current plumbing is insufficient and needs improvement. 

 

End

Recommendation

Recommendation

Adopt the Resolution.

 

Background

The wash bay at the Public Works Center (PWC) is used on a daily basis to clean Public Works vehicles and equipment. The existing wash bay floor plumbing system is original to the building.  Staff uses a pressure washer to wash vehicles and equipment and the existing floor drains frequently get clogged thereby flooding the wash bay floor.  Standard floor drain rodding equipment is often used in an attempt to clear the drains but the rodding equipment is ineffective a majority of the time. Additionally, when the wash bay floor floods, water leaks down into the lower level shop and occupied office space creating unsanitary conditions. 

 

This project includes the replacement of the existing drains and plumbing to alleviate the issues above. It also includes the replacement of two metal doorways in the wash bay that have become rusted and warped over time due to the frequent washing of vehicles in the area and the replacement of the concrete topping slab of the wash bay floor with a new water-proof membrane over the new concrete floor. 

 

The Village issued a Request for Proposals (RFP) on December 14th, 2022, to replace the plumbing in the PWC wash bay. The RFP was advertised in the Wednesday Journal and was posted on the Village web page. The full scope of work associated with the Public Works Center wash bay drainage improvements is described in the Request for Proposals. A pre-bid meeting was held at the PWC on Wednesday, December 21st, 2022. A total of three contractors attended the pre-bid meeting. Proposals were due on Friday, January 13th, 2023.  A total of two proposals were received.

 

D Kersey Construction Co. submitted the most favorable proposal and staff recommends the Village Board approves the Independent Contractor Agreement with D Kersey Construction Co. to perform this work. If approved, the total not to exceed amount for the contract would be $141,120.00 ($134,400.00 proposal cost plus $6,720.00 as a 5% contingency for unforeseen conditions).

 

Fiscal Impact

The Fiscal Year 2023 CIP Building Improvement Fund Budget includes $175,000.00 in account no. 3012-43790-101-540673 for upgrading the Public Works Center wash bay drainage. If approved, the total cost to replace the Public Works Center wash bay drainage system would not exceed $141,120.00.

 

DEI Impact

N/A.

 

Alternatives

The Board can delay action to gain additional information.

 

Previous Board Action

The Board approved funding for this project as part of the 2023 Capital Improvement Plan. 

 

Citizen Advisory Commission Action

N/A.

 

Anticipated Future Actions/Commitments

N/A.

 