Regular Village Board meetings are typically held at 7:00 p.m., the first three Tuesdays of each month in Council Chambers of Village Hall (room 201), 123 Madison St. When a Regular Meeting falls on a holiday, the meeting typically is held the following night. The Village Board also meets in special sessions from time to time. However, dates and times of Special Meetings can vary and may change.

File #: RES 19-67    Name:
Type: Resolution Status: Passed
In control: President and Board of Trustees
On agenda: 6/17/2019 Final action: 6/17/2019
Title: A Resolution Approving an Intergovernmental Agreement between the Village of Oak Park and the Metropolitan Water Reclamation District of Greater Chicago for the Design, Construction, Operation and Maintenance of the Green Alley Improvements Project and Authorizing its Execution
Attachments: 1. Resolution MWRD IGA Green Alleys, 2. Oak Park IGA Green Alley 6-7-19, 3. MWRD IGA Green Alleys Exhibit 1-8 - Combined (for double-sided printing)
Submitted By
Bill McKenna, Village Engineer

Reviewed By
LKS

Agenda Item Title
Title
A Resolution Approving an Intergovernmental Agreement between the Village of Oak Park and the Metropolitan Water Reclamation District of Greater Chicago for the Design, Construction, Operation and Maintenance of the Green Alley Improvements Project and Authorizing its Execution

End
Overview
Overview
The Village received a $475,000 grant to fund approximately 40% of the costs for the construction of six green alleys from the Metropolitan Water Reclamation District of Greater Chicago (MWRD). The Intergovernmental Agreement (IGA) defines the terms and conditions of the grant and construction processes. The project is scheduled to be designed and bid this year with construction occurring in 2020.

Body
Staff Recommendation
Approve the Resolution.

Fiscal Impact
The project will be constructed in 2020. Staff will include funds for the construction of the project which is estimated at $805,000 in the proposed FY2020 budget in the Capital Improvement Fund, Public Works - Engineering, for Alley Improvements account no. 3095-43780-101-570964.

Background
The Village was awarded a Metropolitan Water Reclamation District of Greater Chicago (MWRD) grant to partially fund the installation of six green alleys. Green alleys feature permeable brick pavement that allow rainwater to drain into the soil rather than the Village sewer system. The Village has a small vein of sandy soils that allow for more cost effective installations of permeable pavements since the water can generally infiltrate into the sand as compared to clay based soils. The six alley segments proposed for this green infrastructure are near the sandy soil area and were scheduled for replacement based on their condition in 2019 or 2020. A location map is included as exhibit 1 of the IGA.

The Engineering Division is currently performing geotechnical investigations to ensure the proposed alleys are approp...