Regular Village Board meetings are typically held at 7:00 p.m., the first three Tuesdays of each month in Council Chambers of Village Hall (room 201), 123 Madison St. When a Regular Meeting falls on a holiday, the meeting typically is held the following night. The Village Board also meets in special sessions from time to time. However, dates and times of Special Meetings can vary and may change.

File #: RES 20-035    Name:
Type: Resolution Status: Passed
In control: President and Board of Trustees
On agenda: 2/18/2020 Final action: 2/18/2020
Title: A Resolution Approving an Amendment to the Professional Services Agreement Between the Village of Oak park and Engineering Resources Associates, Inc. for Design and Construction Engineering for Project Number 18-1, Water and Sewer Main Improvements, to Change the Not to Exceed Amount from $186,364 to $246,285 and Authorizing its Execution
Attachments: 1. 2-18-20_Resolution18-1_ERA.pdf, 2. 2-18-20_Amendment18-1_ERA.pdf, 3. 18-1 Amendment No. 1 (revised 2019.12.23).pdf, 4. 18-1ERA_OriginalContract.pdf
Submitted By
Bill McKenna, Village Engineer

Reviewed By
LKS

Agenda Item Title
Title
A Resolution Approving an Amendment to the Professional Services Agreement Between the Village of Oak park and Engineering Resources Associates, Inc. for Design and Construction Engineering for Project Number 18-1, Water and Sewer Main Improvements, to Change the Not to Exceed Amount from $186,364 to $246,285 and Authorizing its Execution

End
Overview
Overview
In May of 2018 the Village of Oak Park entered into an agreement with Engineering Resource Associates for the design and management of the Water and Sewer Main Improvements, Project 18-1. During construction additional work was required beyond the original scope primarily due to the additional work and extended construction duration associated with unforeseen conditions that required replacement of defective large diameter water main valves on Berkshire Street. The various changes total $59,921 and adjust the previously approved contract amount of $186,364 to $246,285.

End
Recommendation
Recommendation
Approve the Resolution

Fiscal Impact
There are available funds for this change order in the FY2019 Water & Sewer Fund, Public Works - Sewer, Sewer Collection, Capital Improvements account no. 5040-43750-781-570707 to fund this change order.

Background
As discussed at the June 17, 2019 Village Board meeting, during construction of the 18-1 Water and Sewer Main Improvement Project a number of defective large diameter valves were encountered on Berkshire Street. The valves required replacement on the project as the water main could not be shut down in order for work to proceed. The Berkshire Street location was anticipated as a 4-month construction project but lasted 6-months which required additional field observation time during construction. Additional time was also spent designing, coordinating and implementing the plan necessary to replace defective valves at select locations along Berkshire to complete ...

Click here for full text